Revision history of "Rolling Wave Planning"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 15:16, 4 July 2020QiratH (talk | contribs). . (524 bytes) (+524). . (Created page with "Rolling Wave Planning is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planne...")