Difference between revisions of "CNM Cloud Embryo"

From CNM Wiki
Jump to: navigation, search
(Minimal viable technology)
(Minimal viable technology)
Line 153: Line 153:
 
:#[[CNM Nets]] that allows for:
 
:#[[CNM Nets]] that allows for:
 
:#*Registration of new users in [[CNM Cloud]];
 
:#*Registration of new users in [[CNM Cloud]];
:#*Assigning [[NetAnyone]], [[NetConsumer]], [[CertAssociate]], and [[CertFellow]] user roles in [[CNM Cloud]]; and
+
:#*Assigning [[NetAnyone]], [[NetConsumer]], [[CertAssociate]], and [[CertFellow]] [[Opplet role|role]]s in [[CNM Cloud]]; and
 
:#*[[Friends Of CNM community|Friends Of CNM communiti]]es;
 
:#*[[Friends Of CNM community|Friends Of CNM communiti]]es;
 
:#[[CNM Mails]] that allows for emailing;
 
:#[[CNM Mails]] that allows for emailing;

Revision as of 10:23, 9 April 2019

CNM Cloud Embryo (hereinafter, the Embryo) is the second phase of CNM Cloud Project (hereinafter, the Project). The work on that phase started in January of 2018 and, as of December of 2018, this phase is still current. CNM Cloud Beginnings is the previous phase.


Requirements

User stories

Three user stories shall describe completion of the second phase:
User story Initial role Allowed actions Results New role
First As a NetAnyone, I shall be able to:
  1. Click the button, Get started, at any CNM Sites;
  2. Get to the Opplet.net registration page;
  3. Fill in my credentials including (a) login name, (b) password, and, (c) optionally, email address;
  4. Submit my credentials
Get to the Welcome to Friends Of CNM course at CNM Certs while being automatically enrolled NetConsumer
Second As a NetConsumer, I shall be able to: Complete the Welcome to Friends Of CNM Get a choice of enrolling into the WorldOpp Orientation or Careerprise for Developers CertAssociate
Third As a CertAssociate, I shall be able to:
  1. Get enrolled into the Careerprise for Developers;
  2. Complete Careerprise for Developers
Obtain a CertDeveloper role CertDeveloper
Fourth
  1. Get enrolled into the WorldOpp Orientation;
  2. Complete the WorldOpp Orientation and get automatically enrolled into the WorldOpp Placement Seminar;
  3. Complete the WorldOpp Placement Seminar
Get enrolled into the WorldOpp Bootcamp CertFellow
Fifth As a CertFellow, I shall be able to: Complete the WorldOpp Placement Seminar Further results shall be accommodated manually, so be assigned Opplet roles.

Default role permissions

App / Role NetAnyone NetConsumer CertAssociate CertDeveloper CertFellow
Nets Visitor User
Certs Visitor Student
Wikis Visitor Registered Admin
Sites Non‑registered Contributor Author
Labs No role User No role

Software to be used

CNM software Description Service Base(s)
Platform Infrastructure Hardware, operating system(s), environment for programming languages to operate, database management systems, web servers (temporarily, outsourced) Not important for the Project
Netware In this phase, user management software that manages authorization of users and their access to CNM apps Nets Written specifically for the Cloud using the Yii framework
Apps User interface to allow end-users to interact with Opplet
Labware Studio for Careerprise vendors to document their developments and store developed files Labs Redmine, Apache Subversion (SVN), (possibly) containers
Certware Learning management software to accommodate learning processes Certs Moodle
Wikiware Knowledge management software to develop corporate knowledge collaboratively and access the results Wikis MediaWiki
Siteware Content management software to empower websites Sites WordPress

Up-to-date story

Several concepts, lessons learned, and pieces of software that was developed in the CNM Cloud Beginnings have been utilized in this successor phase. The Team calls the new phase Embryo because the Embryo of the new cloud is going to be developed during this phase. The key developments could be summarized as follows. The Team:
  1. Identified:
  2. Designed and is implementing a new recruitment process based on the core package of developed technology;
  3. Dramatically increased funding for both technology development and recruitment.

Second cloud initiation

In 2018, Romanof as a PHP developer, Gary Ihar as the product owner, and Natalia as a vendor liaison initiated a new cloud endeavor. Its goal is to create the simpliest system for onboarding employees and Careerprise vendors. The Team called this system embrio. No private cloud itself is going to be launched in the second phase of the Project and even the next phase, which emphasis shall be a new Odoo instance.
During the CNM Cloud Beginnings, a SimpleSAMLphp instance, as an integration tool, worked well, but it had a few drawbacks, most importantly, in difficulties to integrate an Odoo instance. Instead of a SimpleSAMLphp instance, Romanof now implemented an OpenLDAP instance for the directory access. That development completed the third sprint of Opplet.net.

Launch of the Wiki

In spring of 2018, this very CNM Wikis was launched. A new instance of MediaWiki is used for CNM Wikiware. Temporarily, this development used tentative requirements.

New documenting model

Lack of documentation was critical in troubles of the CNM Cloud Beginnings. Now:
  1. Technical requirements for any critical software shall be developed before awarding of any contract. These requirements shall be published at this CNM Wikis;
  2. After awarding any contract, Friends Of CNM shall grant its winner an access to the corresponding project at Fixett;
  3. Technical documentation for the developed software shall be kept posted at Fixett.
The most comprehensive documentation for the Embryo phase was originally created in Russian (using Fixett and the Russian part of CNM Wikis at https://wiki.friendsofcnm.org/ru); however, since the recruitment efforts are shifting to East Africa and the United States, new documents shall be posted at the English part of CNM Wikis.

New management approach

The management model changed substantially:

Early recruitment of apprentices

In summer of 2018, dozens of candidates, primarily from Kenya and Philippines were tested for WorldOpp Fellow Staff positions, but no one has been eventually brought on the board permanently.
  • The majority of most motivated candidates were concentrated on their efforts instead of getting the results. That suggests that their project management skills needed some development;
  • If those candidates were oriented on some results, their desired results were not communicated with the product owner and, consequently, their efforts couldn't be funded. That suggests that their business analysis skills needed some development;
  • It looks like documenting remains at very least one of the biggest problems. No candidate has accomplished more than a dozen of actions on CNM Wikis so far.
A clear recruitment and onboarding process is considered being an important problem to be solved next.

Idea of the Incubator

An idea of WorldOpp incubator was developed in order to create an onboarding process generally and, to develop candidates' skills in business analysis, product ownership, project management, and records management particularly. Its idea is to hire those apprentices who could act as prospective members of WorldOpp Fellow Staff.
The apprentice candidates who participate in the incubator shall be enrolled into WorldOpp Placement Seminar and, consequently, WorldOpp Bootcamp and practice their concepts while creating and bettering curricula, as well as epics, user stories, and other documentation for CNM Cloud at CNM Wikis.
One of possible implementations could be a group of 7-10 apprentices working on some local site somewhere in Kenya. To make it real, a partner on the ground may be looked for.

Launch of the Certs

In the last months of 2018, CNM Certs was unexpectedly launched and tested by students of Shanghai Jian Qiao University. An instance of Moodle is used for CNM Certware. Initially, Gary Ihar opposed launching the Certs without complete technical requirements. However, there was an urgent need in some learning management system used for a program of Vaughn College of Aeronautics and Technology in that university in Shanghai, China. The Certs was tested successfully. Its technical requirements are still needed to be developed.

Development of the Orientation

In January, Kevin temporarily joined the team to help developing materials of the WorldOpp Orientation. Its first session, Welcome to Friends Of CNM, was ready to be launched in mid-February, but Gary Ihar decided to transfer this session from CNM Certs to CNM Sites.

Work on the Sites

In early February of 2019, the CNM Siteware was developed in order to make the launch of FriendsOfCNM.org and other CNM Sites possible. In mid-February, the search for a front-end developer started. As a result, Paul was recruited in March and started working in early April.

Minimal viable technology

By April of 2019, a minimal viable product (MVP) of future CNM Cloud had been defined and launched. It includes:
  1. CNM Nets that allows for:
  2. CNM Mails that allows for emailing;
  3. CNM Contacts that allows for customer relationship management and temporarily plays a role of CNM Ventures, which is scheduled to be launched in the next phase of the Project;

. On another side, instances of Apache Subversion (SVN) and Redmine are used for CNM Labware.

Deliverables of Embryo phase

Projected deliverables:
  1. A software system capable to execute the User stories;
  2. Contracts between Friends Of CNM and Careerprise vendors to run:
  3. Contracts between Friends Of CNM and members of WorldOpp Fellow Staff to run:
  4. Curricula at CNM Certs:
  5. Organizational structures:

Current state

Developers

Three members of the development group who are currently working on the Project are as follows:
  1. Romanof. As the PHP sub-project manager and developer, Romanof developed all working parts of the existing technology. Romanof also documented in Fixett a deal of the work done;
  2. Gary Ihar. As the product owner, Gary is drafting documentation in CNM Wikis on every software included in the second phase;
  3. Natalia. As a vendor liaison, Natalia is working on CNM Wikiware documentation.
  4. Paul. As a front-end developer, Paul is working on user interfaces of CNM Sites.

Completion rates

The DADP is the development cycle that includes 4 components: (1) discover, (2) analyze, (3) design, and (4) plan. No component is fully developed to the date. The following table presents estimates on every component of every software to be launched:
CNM software Service Sprint Description Discover Analyze Design Plan
Platform Infrastructure (temporarily, outsourced) Second Requirements and designs are drafted in Russian in Fixett; DigitalOcean is temporarily used for implementations 90% 90% 90% 90%
Opplet Opplet.net Fourth Requirements and designs are drafted in Russian in Fixett; Opplet.net handles user management for CNM Cloud 75% 75% 75% 75%
Apps
Labware Fixett Second Requirements and designs are drafted in Russian in Fixett; the current implementation is located at a classified URL 50% 50% 50% 50%
Certware Certs Second Requirements and designs are drafted in Russian in Fixett and English in CNM Wikis; the current implementation is located at https://certs.friendsofcnm.org 50% 50% 50% 50%
Wikiware Wikis Second Requirements and designs are drafted in Russian in Fixett and English in CNM Wikis; the current implementations are located at https://wiki.ksacerts.com and, in Russian, at https://wiki.friendsofcnm.org/ru 50% 50% 50% 50%
Siteware CNM Sites Second Requirements and designs are drafted in English in CNM Wikis; the first instance is installed at https://friendsofcnm.org; its requirements have been started at FriendsOfCNM.org 50% 50% 50% 50%

Challenges

Lack of procurement documentation is still the primary obstacle for the Project to move forward faster. There are a plenty of developers ready to implement technical requirements, but those requirements are needed to be documented. If some backup has been de-facto implemented, the state of cyber-security is either inappropriate or unknown.

Vacancies

Neither education nor experience is needed for the vacancies listed below. Full-time (at least, 40 hours a week) availability and willingness to learn on the job (and any learning includes so-called "errors" and "mistakes") are absolute musts. Since English language is the primary medium at Friends Of CNM, some level of English capacity is needed as well.